Close Menu
    What's Hot

    Only 11.8% of Ghana’s private schools teach local languages, new report reveals

    June 9, 2026

    Heavy rains flood Weija Highway, leaving motorists stranded in hours-long gridlock

    June 9, 2026

    Citizen sues Government over MPs’ share of District Assemblies Common Fund

    June 9, 2026
    X (Twitter) Instagram YouTube TikTok
    Yocharley
    X (Twitter) Instagram YouTube TikTok
    • Home
    • General News
    • Entertainment
    • Business
    • Sports
    • Technology
    • International News
    Yocharley
    Home » Heavy rains flood Weija Highway, leaving motorists stranded in hours-long gridlock
    Featured

    Heavy rains flood Weija Highway, leaving motorists stranded in hours-long gridlock

    By Constance AwunorJune 9, 2026No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    Heavy rains that hit Accra on Tuesday morning caused severe flooding on the Weija SCC–Atala stretch of the Accra–Takoradi Highway.

    The floodwaters covered parts of the road and left thick layers of silt on the highway. Several vehicles got stuck, while traffic slowed to a crawl.

    Many commuters faced long delays. A journey that normally takes about five minutes lasted more than two hours.

    The flooding blocked both the eastbound and Accra-bound lanes. As a result, motorists had to use the westbound carriageway.

    The diversion created heavy congestion. Long queues of vehicles stretched for more than five kilometres.

    Drivers struggled to move through the flooded area. Some vehicles became trapped in the silt and needed assistance.

    One stranded vehicle reportedly remained stuck for more than an hour while people tried to remove it from the road.

    Floodwaters covered nearly a kilometre of the eastbound side of the highway. Debris and mud made the stretch difficult to access.

    The flooded road created major challenges for drivers and increased travel times across the area.

    The latest incident has once again raised concerns about flooding along the Weija corridor.

    A motorist identified as Prince called on the government to speed up funding for the ongoing drainage project.

    He said completed drains around Barrier, Atala and the SCC area are working well. However, large sections of the project remain unfinished.

    According to him, floodwaters continue to cause damage before reaching the completed drains.

    “The new drains are working, but much of the project is still incomplete. Floodwater causes damage before it reaches the finished sections,” he said.

    Prince urged the public not to blame contractors for the flooding. He noted that work on the project is still ongoing.

    Many motorists expressed frustration as traffic remained at a standstill for hours.

    By Tuesday morning, long lines of vehicles had formed on both sides of the affected stretch.

    The flooding once again highlighted the need for a lasting solution to the recurring problem on the Weija section of the Accra–Takoradi Highway.

     

    Accra-Takoradi Highway Heavy rains Traffic Congestion Weija Flooding
    Previous ArticleCitizen sues Government over MPs’ share of District Assemblies Common Fund
    Next Article Only 11.8% of Ghana’s private schools teach local languages, new report reveals
    Avatar photo
    Constance Awunor

    Constance Awunor specializes in business, finance and economic developments across Ghana and beyond. She focuses on market trends, entrepreneurship and policies affecting young professionals and emerging industries. Her writing simplifies complex financial topics, empowering readers to stay informed and make smarter decisions. Constance graduated from University of Cape Coast with a degree in Communication Studies. Connect with her at constance@yocharley.com

    Related Posts

    Education

    Only 11.8% of Ghana’s private schools teach local languages, new report reveals

    June 9, 2026
    Economy

    Citizen sues Government over MPs’ share of District Assemblies Common Fund

    June 9, 2026
    Central Region

    One dead, JHS graduate missing after flood-related drownings in Twifo Atti-Morkwa

    June 9, 2026
    Featured

    France’s Macron to address reparatory justice conference in Accra

    June 9, 2026
    Featured

    Attorney-General to engage US justice department on pending extradition cases

    June 9, 2026
    Corruption

    Sedina Tamakloe-Attionu returned to Ghana to serve 10-year jail term

    June 9, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Don't Miss

    Only 11.8% of Ghana’s private schools teach local languages, new report reveals

    By Constance AwunorJune 9, 20260

    A new report has revealed that only 11.8% of private and international schools in Ghana…

    Heavy rains flood Weija Highway, leaving motorists stranded in hours-long gridlock

    June 9, 2026

    Citizen sues Government over MPs’ share of District Assemblies Common Fund

    June 9, 2026

    One dead, JHS graduate missing after flood-related drownings in Twifo Atti-Morkwa

    June 9, 2026
    @2025 Yocharley, Designed by Adoit360.
    • Home
    • About Us
    • Contact Us
    • Terms and Conditions
    • Privacy Policy
    • Fact-Checking Policy
    • Editorial Policy

    Type above and press Enter to search. Press Esc to cancel.